久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Homepage > Product > Zhuhai stone factory
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://www.moodyenergy.com.cn

Zhuhai stone factory

Zhuhai stone factory

Zhuhai Quarry Workshop
Project Description
Guangdong Changheng Group occupies an area of 600000 squire meters,
Measures to prevent dust generated by crushing stones is using the closed steel structure workshop made by Foshan Sheng Bang Steel Structure Co.,(for short “SBS”). The gravel is mainly used for the processing of base-level bedding, highway engineering, airport reclamation and so on. The breaking production line is the leading technology in China with high productivity and high efficiency. The crushing site is close to the dock and the aggregate can be transported by a two-kilometer large conveyor belt to the transport ship.

Project Prominent point
With prefabricated steel structures, high-efficiency deep pre-fabrication is carried out in advance by SBS, which greatly increases construction efficiency and saves twice the time of traditional concrete or steel construction on site. Because it is crushed aggregates, dust is very diffuse, in order to achieve the effect of green mining. SBS seals the production line of the crushing yard, and cooperates with dust-collecting environmental protection equipment, spray atomization and other dust prevention measures. The workshop is completely closed, which is beneficial to the production without weather, but also provides workers with a good working environment, greatly mobilizes workers' enthusiasm for production, and promotes production efficiency. As the crushing equipment needs to periodically replace the crusher's dental plate and vibrating screen, the factory is equipped with a 25-ton crane and can go through every lifting position. It can be produced or overhauled without fear of wind and rain in a closed workshop.
In the Zhuhai Quarry Steel Structure Workshop project undertaken by SBS prefabricated steel structure deep prefabrication construction technology is applied to the prefabrication of steel structures such as pipe frames and equipment platforms. Designed through 3D professional modeling, detailed to the connection position and bolt arrangement. The professional design team conducted a detailed technical investigation, eliminated the difficulties of prefabricated steel structures, multiple nodes, high design requirements, and short installation time, and completed efficiently all production difficulties. The prefabricated depth of all steel structures reaches 98%, and the tolerances of the axis lines, elevations, and joint positions of the system's pipe racks are controlled within 2mm, and there are no reworks beyond the millenium pipe racks. The hole position, aperture, quantity, etc. of several million bolts are matched with the field installation with no mistake.

Project achievement
1.Green and closed mining
The traditional mining work is generally open-pit mining. Due to the relatively large environmental pollution caused by aggregate crushing and screening dust, closed mining significantly reduces the environmental pollution caused by mining. In response to President Xi Jinping’s call to “Lucid waters and lush mountains are invaluable assets.”, the project was conducted by the design team of SBS on site and the technicians used a three-dimensional approach. Software modeling, detailed node construction, simulation of on-site assembly effects, and solving the problem of closed mining restricted by space.

2.Steel structure workshop: weatherproof, anti-vibration, closed production, prevent dust
The overall design of the steel structure is particularly critical for the entire building. The design team of SBS first designs the floor plan using CAD software in Zhuhai quarry workshop, then uses 3D software to model it, and the data is then modeled by the chief engineer. Analyze and contrast, design the scheme that suits the actual demand of the workshop most, make the steel structure workshop reach weatherproof, anti-vibration, closed production, prevent dust
After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.
With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

Zhuhai quarry steel structure design drawings and installation drawings are as follows

設計圖.png

Quarry workshop steel column installation

With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

未命名1.png

Quarry workshop steel beam installation

---2

Quarry workshop wall installation

After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.

---3

Zhuhai steel structure quarrying workshop - multiple transmission belts

20180522101628_8354294


 

 

Hits:12134 Time:[2020-9-5]

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91热爆| 国产青草视频在线观看免费影院| 高清不卡一区| 欧美日韩国产亚洲一区二区三区| 午夜福利试看120秒体验区| 激情视频激情小说| v视界影院_vsjla| 亚洲精品www久久久久久久软件| 精品福利一区二区免费视频| futa百合文| 日本高清在线看免费观看| 魔法满屋免费观看完整版中文| 国产区最新| 色综合视频在线观看| 欧美一级欧美三级| 九九精品免费视频| 水野朝阳厨房系列在线观看 | 国产亚洲女在线线精品| 99热最新在线观看| 日本老妇乱子伦中文视频| 久久99亚洲热最新地址获取| 日本免费的一级绿象| 亚洲一卡2卡三卡4卡5卡组| 亚洲 无码 制服 日韩| 成人在线一区二区| 91精品手机国产在线观| 四虎影视网址| 日韩操比视频| 水蜜臀| 青青国产成人久久91网| 好性20岁| a毛片免费观看完整| 国产日韩欧美综合一区二区三区| 无码毛片内射白浆视频| 四虎论坛| 亚洲不卡视频| 欧美精品国产第一区二区| 久久五月综合婷婷中文云霸高清| 白丝美女用胸伺候主人| 久久伊人电影| 日本人成在线视频免费播放|