Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2071

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 美女被爆| 美女gif跪趴式抽搐动态图| 国产激情视频在线| 久久久乱码精品亚洲日韩| 特级一级全黄毛片免费| 91免费在线| 草莓社区| 亚洲小视频在线| 免费一级特黄特色大片在线| 色综合图区| 褪色的憎恨| 美女的隐私无遮挡撒尿| 香蕉久久网| 国产成人精品第一区二区| 欧美日韩国产精品va| 色女的乖男人| 好男人资源在线观看免费的| 亚洲免费在线看| 国产精品免费综合一区视频| 成年人天堂| 福利一区三区| 亚洲成色WWW久久网站夜月| 国产精品99久久久| 白丝超短裙被输出娇喘不停小说| 精品国产91久久久久久久a| 国产99视频精品免费视频免里| 男同gay作爰视频网站| 亚洲精品91| 国产成人精品高清在线| 韩国理论片最新第一页| 美女又爽又黄免费| 亚洲国产精品无码中文字幕| 久久se视频精品视频在线| 污污免费| 满溢游泳池免费土豪全集下拉版| 魔法满屋免费观看完整版中文| ady成人映画网站官网| 极限淫生小说| 久久99国产视频| 亚洲爱视频| 欧美影院一区二区|