Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2523

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: xxx黑人又大粗又长| 国产尤物精品视频| 亚洲欧美日韩国产精品一区| chinese456老人gay| 日出水了特别黄的视频| 无码一区国产欧美在线资源| 99视频久久| 欧美黑人一级片| 亚洲AV蜜桃永久无码精品无码网| 韩国久久| chinese456老年gay| 免费在线视频网站| 小鸟酱喷水| re99| 肠交女王magnet| 日韩欧美中文字幕一区| 日本加勒比无码av| 国产真实偷乱视频在线观看| 91国内精品| 四虎影视网站| 欧美在线视频一区| 欧美日韩国产在线人成| 国产绳艺在线播放| 国产成人精品免费2021| 91久久碰国产| 欧美日韩专区国产精品| 亚洲国产情侣一区二区三区| 黑人巨大精品战中国美女| 超级乱淫伦小说1女多男| 国产精品亚洲专区一区| 欧美日韩精彩视频| 美女天天色| 日本高清视频网站www| 欧美日韩高清不卡一区二区三区| 兽皇日本| 色琪琪久久草在线视频| 特黄aa级毛片免费视频播放| blacked黑人hd2021| 成年人黄色录像| 久久久免费观看| 国产欧美精品一区二区三区–老狼|