久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > Installation details that must be paid attention to in steel structure processing
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2154

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲精品www久久久久久| 视频亚洲一区| 91欧美秘密入口| 美女逼逼软件| 日韩免费毛片视频杨思敏| 法国贵妇一级伦理hd| 超级乱淫变态伦短篇小说全集| 日韩一本在线| 日本视频免费看| jk制服喷水| 北岛玲亚洲一区在线观看| 四虎在线视频免费观看视频 | chinese踩踏调教vk| 国产精品一区二区不卡的视频| 亚洲爆操| 人成网站在线观看| 国产免费资源| 99久久香蕉| 色综合伊人色综合网站中国| 日本高清中文字幕| 午夜精品久久久内射近拍高清| 欧美最猛性xxxxx男男| 无码区国产区在线播放| 成人快手破解版| 性欧美金发洋妞xxxxbbbb| 免费人成在线观看69式小视频| 欧美性高清另类videosex死尸| 国产无限免费观看黄网站| 边吃胸边膜下刺激免费男对女| 亚洲精品视频久久| 四虎2021地址入口| 四虎影院地址| 亚洲精品网址| 香蕉eeww99国产精品| 黑人性xxx| 久久久久久久久人体| 久久艹综合| 69堂最新地域网名| 秋霞717理论片在线观看| 我与么公激情性完整视频| 我被黑人彻底征服的全文|