Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2442

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 娇妻与老头绿文小说系列 | 亚洲视频在线免费 | 国产99在线观看 | 国产一级特黄aa大片免费 | 国产白白视频在线观看2 | 成人久久伊人精品伊人 | 国产福利视频一区二区微拍视频 | 亚洲女同在线观看 | 无码人妻丰满熟妇啪啪网不卡 | 国产高清在线精品一区二区 | 欧美亚洲国产另类 | 亚洲AV中文字幕无码久久 | 91中文字幕yellow字幕网 | 2018天天拍拍拍免费视频 | 日本一区二区视频免费播放 | a级成人毛片免费图片 | 91欧洲在线视精品在亚洲 | 成人网视频免费播放 | 欧美又大又粗又爽视频 | 色婷婷六月丁香在线观看 | 久久99国产精品二区不卡 | 成人精品一区二区三区中文字幕 | 好大水好多好爽好硬好深视频 | 天堂网www在线中文天堂 | 精品小视频在线 | bl双性肉文 | 91精品国产高清久久久久久91 | 好爽好紧小雪别夹小说 | 秋霞理论一级在线观看手机版 | 成人免费在线视频 | 亚洲男人天堂a | 免费国产成人 | 日韩精品一区二区三区免费视频 | ipx-177绝对领域在线观看 | 国产香蕉97碰碰久久人人 | 亚洲精品视频专区 | 国产精品露脸国语对白99 | 91精品91久久久久久 | 青青草原网 | 亚洲精品福利一区二区在线观看 | www.久久精品视频 |