久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2781

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲免费高清视频 | 农村美女沟厕嘘嘘被偷看 | 日本哺乳期网站xxxx | 69re在线观看 | 亚洲精品久久7777777 | 亚洲成人黄色 | 精品福利视频一区二区三区 | 精品免费国产一区二区三区 | 青柠网在线观看视频 | asianfemdom妍妍女王 | 久久综合老色鬼网站 | 成人夜视频寂寞在线观看 | 日韩免费一级片 | 韩国三级日本三级香港三级黄 | 四虎影院最新网址 | 亚洲国产精品久久网午夜 | 免费二级毛片免费完整视频 | 99只有精品| 天天做天天爽天天谢 | 香蕉草莓视频 | 久久精品国产免费播高清无卡 | 情人我吃糖果小说 | 日韩欧美国产在线 | 视频免费看 | 国产日韩欧美 | 欧美一区二区三区精品 | 成人丁香乱小说 | 天堂精品高清1区2区3区 | 婷婷激情综合五月天 | 欧美一区二区三区免费高 | 偷偷操不一样 | 国产精品特黄毛片 | 好大夫在线个人空间 | 四虎影院4hu| 波多野结衣亚洲一区 | 精品无人区麻豆乱码无限制 | 催眠 迷j系列小说 | 法国贵妇一级伦理hd | 果冻传媒i91media免费 | 美女的让男人桶爽30分钟的 | 国产精品香蕉一区二区三区 |