久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2454

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 2021国产精品视频| 成人3p视频免费| 四虎永久| 色狠狠成人综合网| 精品一成人岛国片在线观看| 图片专区小说专区卡通动漫| 韩国三级视频网站| www四虎| 日韩免费| 99免费精品视频| 香港三级血恋3| 男人插曲女人身体| 841995论坛网站2022年| 91制片厂 果冻传媒 天美传媒| 欧美成人精品福利网站| 男人机机桶女人| 国产成人精品视频频| 无码乱人伦一区二区亚洲一| 韩国美女激情vip| 99久久6er热免费精品| 5x社区发源地最新地址| 亚洲29p| 天天做日日爱| 精品国语对白精品自拍视| 99热com| a级黄色片免费| 免费观看成年肉动漫网站| 日本888 xxxx| 女高h| 草莓视频网站18勿进| 精品手机在线视频| 九九精品99久久久香蕉| 欧美男人天堂| 欧美一区二区三区综合色视频 | 貂蝉沦为姓奴小说| 久久久久琪琪精品色| 国产精品久久久久久久免费大片 | 午夜爱爱片| 午夜人妻理论片天堂影院| 色噜噜 男人的天堂在线观看| 97超pen个人视频公开视频视|