How to effectively improve the How can the installation accuracy of steel factory building be effectively improved?

Time:[2021-7-15]  Hits:3213

In the construction industry, as the use of steel factory building becomes more and more popular, more and more attention is paid to the production, transportation and installation technology of steel factory building, and at the same time, rapid development and continuous improvement have been achieved. How to further improve the production and installation accuracy of steel factory building and reduce costs are a topic facing the steel factory building industry. From the perspective of improving the installation accuracy of steel factory building, some issues and specific control methods that must be highly valued in the main links of production, transportation, and installation are analyzed and summarized.

 

 

Steel factory building production and transportation control


The precise size of the steel structure building is the basic and prerequisite to ensure the accuracy of the overall structural size and the smooth installation. Therefore, it is necessary to accurately grasp the straightness and distortion of the steel column, The distance from the connecting holes of the column and beam to the bottom of the column, the processing accuracy of the connecting holes, the straightness of the roof beams and the processing accuracy of the column-beam connecting plates, the position size of the tie bars or support connecting plates relative to the beam and column itself and the position size of the purlin brackets and etc.

 

 

In order to avoid and reduce the columns, beams, tie bars and other fittings deformation occurred during transportation, The transportation company should be required to add more support points in the full length range when binding the components, and use wood as hard as possible between them. The peripheral binding should be firm so as to minimize the deformation of the components due to vibration or heavy pressure in the transportation process. Two-point hoisting method should be used when loading and unloading. If the components are too long, a pole can be used and the hanging points should be appropriately increased; when the components are stacked at the worksite, the number of layers should be reduced as much as possible, generally no more than 3 layers, meanwhile, the supporting points should be appropriately increased to prevent the components from deforming under pressure. Never relax the control of transportation, lifting, unloading, stacking, etc. Otherwise, even if the steel structure plant’s components are made accurately, there will be problems in the transportation and other links, which will cause major troubles in the installation of the steel structure plant.

 

 


Quality control of steel factory building installation process

 

Before the steel factory building is installed, various preliminary work must be done in earnest. For example, before hoisting, the installer should retest the components, and hoisting can only be carried out under the premise that the components are not deformed and the installation dimensions are correct. In addition, after confirming that the strength of the foundation concrete meets the requirements of the specification, the installer should also inspect the embedded bolts or cup openings of the steel column foundation. If the position of the foundation and the elevation dimension are found to be deviated, the position should be recorded so as to adjust the position of the steel column.

 


In order to improve the installation precision of the overall steel factory building, it is best to choose the part of the workshop that has inter-column supports, tie rods and roof supports to install first. After this part of the steel column is hoisted, the axis and elevation of the steel column should be re-measured. After rectifying the deviation, the steel column is temporarily stabilized with the cable wind rope, and then the column supports, roof beams and inter-beam tie rods are installed. This is the so-called Rough installation.

 


All temporary fixing bolt holes that need to be welded on-site should be designed with long shaped holes, which is convenient for installation and adjustment, and is more beneficial to ensure the overall installation accuracy. The unilateral connecting holes of the purlin and other secondary components should also be designed with long shaped holes, of course, the related gaskets should be enlarged accordingly. Special attention should be paid to the fact that since the installation of the purlins is high-altitude operations and the wall is thin, if the installation holes are deviated and sprayed at high altitudes, it will indeed cause a lot of inconvenience, danger, and affect the appearance.


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 被夫上司强迫中文 | 四虎在线最新地址公告 | 美女被吸乳老师羞羞漫画 | 免费国产之a视频 | 奇米影视中文字幕 | aaaa黄 | 亚洲AV久久无码精品九号软件 | 精品久久免费观看 | 天堂在线中文无弹窗全文阅读 | 精品免费久久久久久成人影院 | 国产a免费观看 | 91精品国产高清久久久久 | 天堂久久久久va久久久久 | 天堂网在线网站成人午夜网站 | 亚洲色图综合网 | a色在线 | 全肉一女n男np高h双龙养成 | 亚洲免费闲人蜜桃 | 欧美二区三区 | 男女视频在线观看 | 国产麻豆网 | 国产资源在线视频 | 边摸边吃奶边做爽视频免费 | 国产精品国色综合久久 | 日本一道本中文字幕 | 北条麻妃一区 | 日韩色图区 | 天美网站传媒入口网址 | 精品国产一区二区在线观看 | 国产美女做爰免费视频软件 | 免费370理论片中文字幕 | 国内精品国语自产拍在线观看55 | 俄罗斯三级完整版在线观看 | 国产高清精品自在久久 | 明星ai人脸替换脸忘忧草 | 国产好痛疼轻点好爽的视频 | 欧美日韩在线观看精品 | bbbbbbaaaaaa毛片 | 亚洲精品一区二区三区在线播放 | 欧美精品一区二区三区免费 | 禁忌4中文 |