久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3026

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 四虎最新免费观看网址| 美女舒服好紧太爽了视频| 女人把私密部位张开让男人桶 | crdy在线看亚洲| 日韩色在线观看| 美女扒下内裤让男人桶的图片| 日韩成人av在线| 国产卡一卡二卡三卡四| 学生小泬无遮挡女HD| 美女扒开奶罩让男人吃奶| 小小水蜜桃3视频在线观看| 99精品影院| 欧美日韩一级视频| h版小说| 我要看逼| 91探花在线观看| 亚洲第一区se| 国产精品欧美韩国日本久久| 美女自插| 手机看片一区二区| 亚洲qvod图片区电影| 99在线精品日韩一区免费国产| 性白俄罗斯高清xxxxx| 99久久香蕉国产线看观香 | 国产亚洲精aa在线观看不卡| 好男人社区www影院在线观看| 色欲麻将| 精品亚洲午夜久久久久| 美女脱了内裤张开腿亲吻男生| 亚洲国产精品久久卡一 | 免费特黄视频| 美女被扣逼| 99久久99热久久精品免| 国产麻豆91欧美一区二区| 欧美另类性xxoo| 午夜影视免费| a男人天堂| 93版高校教师| 精品国产乱码久久久人妻| 免费a视频在线观看| 国产精品久久久久久久久免费观看|