Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4140

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一区二区不卡视频 | 国产精品毛片va一区二区三区 | 日产乱码卡1卡2卡三免费 | 午夜福利体验免费体验区 | 天天乐影院 | 免费一级毛片在线播放 | 99久久精品免费看国产 | 欧洲美女女同 | 男男gaygays18中国 | 精品一久久香蕉国产二月 | 色婷婷精品| 91热这里只有精品 | 菠萝视频污 | 成人一级黄色大片 | 亚洲 欧美 日本 国产 高清 | 亚洲精品第一国产综合高清 | 欧美久久久久久久一区二区三区 | 美味情缘韩国在线观看视频 | 日本中文字幕在线视频站 | 亚洲欧美自偷自拍另类小说 | 免费亚洲视频在线观看 | 国产精品免费拍拍拍 | 国产成人福利免费视频 | 亚洲欧美精品一区二区 | japanese日本护士 | 久久久无码精品亚洲A片软件 | 丝袜捆绑调教丨vk | 9966久久精品免费看国产 | poren黑人 | 9420高清完整版在线观看国语 | 狠狠色综合久久婷婷色天使 | 四缺一小说 | 日麻逼 | 成人精品免费网站 | 日本无卡无吗中文免费 | 久久伊人精品青青草原2021 | 国产成人在线小视频 | 美女扒开两腿露出尿口的视频 | 乌克兰xxxxx| 欧美整片完整片视频在线 | 国产成年人在线观看 |