Foshan General Steel measuring program

Time:[2016-7-6]  Hits:3983

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 性xxxx直播放免费| 色婷婷久| 亚洲国产精品福利片在线观看| 欧美3p大片在线观看完整版| 唯美清纯 自拍偷| 亚洲精品国产成人中文| 成人黄页网站| 色播影院性播影院私人影院 | 91精品免费观看老司机| 国产成人精品第一区二区| 国产精品视频一区二区三区经| 男人天堂网站在线| 日本伊人色综合网| 香蕉久久久| 禁欲天堂| 99福利影院| 欧美亚洲天堂| 香蕉eeww99国产精品| 性俄罗斯xxxxxhd| 亚洲成人视屏| 男人的天堂在线观看视频不卡| 2022最新a精品视频在线观看| 国产精品久久国产精品99| 36美女厕所撒尿全过程| 日韩在线资源| 国产videos hd| 国产一区二区三区欧美| 91免费精品国自产拍在线可以看| 欧美一区二区三区在线观看免费 | 青青草原在线| 成人在线观看网站| 成人蜜桃网| 全黄h全肉细节修仙玄幻文| 日本无吗免费一二区| pregnant欧美孕交xxx| 无套插入| 免费欧美日韩| 98色花堂永久地址国产精品| 双性总裁被调教1v1| 被强迫调教的高辣小说| 慢慢娇淫|