Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4616

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本韩国一区二区三区| 香蕉大久久| 国产成人精品在线观看| 9久re热视频这里只有精品| 美女狂揉尿口揉到失禁| 久草热8精品视频在线观看| 蜜桃久久久亚洲精品成人| 国产免费又粗又猛又爽视频国产| 午夜神器18以下不能进免费| 8x8x拔插| 九九热在线免费观看| 日本肉体xxxx69xxxx| 日本性爱| 九九精品视频在线免费观看| 国产欧美va欧美va香蕉在线观| 亚洲小视频| 亚洲国产精品自在自线观看| 国产一区国产二区国产三区 | ass韩国美女人体pics| 无人影院免费观看| 国内精品视频一区二区三区八戒 | 97社区| 冰山美人调教耻辱h| 日韩国产成人资源精品视频| 色综合久久综精品| 国产资源一区| 国产99热| 国产久热精品| 国产成人久视频免费| 欧美成人精品福利在线视频| 青青在线观看| 涩涩屋视频在线观看| 国产欧美一区二区精品性色| 极品美女写真菠萝蜜视频| 日本在线视频播放| 女教师波多野结衣高清在线| 亚洲国产欧美日韩在线一区| 成人福利在线播放| 高清女主播一区二区三区| 交换朋友夫妇3中文字幕| 天天成人|