Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4981

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲精品乱码久久久久久蜜桃欧美 | 国产亚洲福利精品一区二区 | 俄罗斯烧性春三级k8播放 | 91桃花| 色综合天天综合网国产人 | 99精品国产高清自在线看超 | 精品久久看 | 91久久线看在观草草青青 | 欧美日韩亚洲国内综合网俺 | 我的好妈妈7中字在线观看韩国 | 男人天堂网址 | 精品小视频在线 | bdsm中国精品调教 | 成人免费视频一区二区三区 | 美女张开下身让男人桶 | 奇米影视在线观看 | 国产在线观看福利 | 性德国高清xxxxbbbb | 特级av毛片免费观看 | 女人被男人躁得好爽免费视频 | 色综合久久最新中文字幕 | 精品99一区二区三区麻豆 | 我的年轻漂亮继坶三级 | 香蕉视频在线观看网站 | 欧美一级视频在线观看 | 毛片资源 | 日韩一区视频在线 | 成人福利免费在线观看 | 亚洲国产精品成 | 免费理伦片在线观看全网站 | 99er在线观看| 亚洲gogo人体大胆西西安徽 | 1769亚洲资源站365在线 | 女女性恋爱视频入口 | 国产亚洲精品看片在线观看 | 青青在线国产视频 | 欧美色影视 | 国产精品边做边接电话在线观看 | 操美女网址 | 亚洲国产精品久久久久久网站 | 人与蛇boxxⅹ |