Foshan main steel members (b)

Time:[2016-5-14]  Hits:4939

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 99er在线观看| 久久高清一级毛片| 把老师操了| caonila国产在线观看| 亚1洲二区三区四区免费| 亚洲小视频在线| 亚洲福利在线观看| 99视频九九精品视频在线观看| 丰满肥臀风间由美357在线| 美女扒下内裤让男人桶的图片| 国产在线看片网站| 日本粉色视频| blacked亚裔videoshd| 洗濯屋し在线观看| 国内精品久久久久久野外| 色愉拍亚洲偷自拍| 狠狠操社区| 欧美18-19| 91青青国产在线观看免费| 美女被草出水| 成人观看免费观看视频| 污书屋| 波多野结衣家庭教师| 奇米社区| 91tv在线观看| 日韩操片| 日韩在线 在线播放| 国产高清视频一区二区| 欧美一区二区视频| 青青青手机视频| 精品在线看| 欧美精品色精品一区二区三区| 女bbbbxxxx视频| av毛片在线看| 亚洲第成色999久久网站| 我把校花黑色蕾丝胸罩脱了| 京东热dj6666| 国产香蕉97碰碰久久人人| 亚洲福利 影院| 小莹的性荡生活45章| 国外欧美一区另类中文字幕|