Foshan main steel members (b)

Time:[2016-5-14]  Hits:5305

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 亚洲人成网站在线观看妞妞网 | 末代皇帝无删减版在线观看 | 日本在线播放 | 99热这里只有精品在线 | 9191精品国产观看 | 亚洲成人福利 | 日本男男漫画 | 国产高清在线播放刘婷91 | 99ri在线精品视频在线播放 | 无限在线观看视频大全免费高清 | 天天色天天综合 | 含羞草传媒网站免费进入欢迎 | 人皮高跟鞋在线观看 | 久久精品视频免费 | 维修工的调教 | 国产伦精一区二区三区视频 | 好湿好紧好多水c | 美女扒开两腿露出尿口的视频 | 国产日韩精品一区二区在线观看 | 色综合久久最新中文字幕 | 99久久精彩视频 | 5g影院天天 | 秋霞鲁丝影院久久人人综合 | 爽好舒服快想要免费看 | 国产裸舞在线一区二区 | 我与么公激情性完整视频 | bb18lv黑料正能量 | 插入逼| 91综合久久| 亚洲黄网站wwwwww | 全肉一女n男np高h乳 | 国产老肥熟xxxx | 99精品久久99久久久久久 | 543精品视频| 韩剧在线观看 | 俄罗斯毛片免费大全 | 海绵宝宝第二季全集免费观看 | 69日本人 | 午夜伦理 第1页 | 国产精品久久久久久久久久久搜索 | 32pao强力打造免费高速高清 |