久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > Steel Engineering strength bolted connection inspection requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

Steel Engineering strength bolted connection inspection requirements

Time:[2016-3-9]  Hits:4178

Steel Engineering strength bolted connection inspection requirements

High strength bolt friction surface should be smooth, dry, iron oxide surface may not have skin, burr, burr, paint and oil, remove loose rust with a wire brush along the direction perpendicular to the force. And shall not be installed in the rain.

Use a torque wrench should be required to calibrate torque wrench set to respond before the class to be checked before using.

Guangzhou Steel in strict accordance to the surrounding extended from the middle of the order, the early implementation of twist, twist the end of the construction technology program, non-step method of direct final twist. A high-strength bolted joint on bolt group should be central to start the installation, one by one tightening, tighten it again each application are different colors of paint be marked to prevent leakage twist. High strength bolts fastening parts order from stiffness to unfettered free end be carried out from the middle to the edges, so that the adhesiveness between the plates.

Should be free to penetrate the high-strength bolts bolt hole. When reaming, iron may not fall into lamellar. Reaming shall not exceed 1/3 of one joint bolt hole, reaming diameter of not greater than 2 mm aperture together. High strength bolts were forbidden to use gas cutting reaming work.

Guangzhou Steel long-term storage of more than six months or improper care caused by rusty bolts and contaminated dirt, may alter the performance of the torque coefficient or bolts of high strength bolts, as the case should be cleaned, rust and lubrication process, and the torque coefficient or bolt pre-tension test, qualified before use.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 精精国产xxxx视频在线播放器| 精品免费国产| 好吊色视频988gao在线观看| 亚洲第一色网| 国产成人亚洲精品一区二区在线看| 99er热| 亚洲va精品中文字幕| 精品成人一区二区三区免费视频| 亚洲另类老妇videos| 日日操美女| 国产一级大片免费看| 成人免费在线视频观看| 男人好大好硬好爽免费视频| 日韩经典在线| 国产精品视频2021| 国产在线视频一区二区三区| 羞羞视频免费观| 亚洲精品国产AV成人毛片| 8x8x拔插| 久久er国产免费精品| 欧美3d怪物交videos网站| 久久精品WWW人人爽人人| 麻生希在线观看| 无人影院免费观看| 6080午夜| 不卡一区二区三区| h网站国产| 91.prom在线观看国产| 日本xxx18hd| 日本不卡1卡2卡三卡网站二百| 福利视频免费| 国产精品国产国产aⅴ| 扒开双腿猛进入爽爽视频ai| 日韩小视频在线观看| 日本国产最新一区二区三区| 性色xxx| 国产精品一区三区| 九九大香尹人视频免费| 国产视频二区| 91九色最新地址| 国产欧美一区视频在线观看|