raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4929

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美日本一道高清二区三区 | 蜜桃视频一区二区三区四区 | 99久久精彩视频 | 狠狠色综合久久婷婷色天使 | 美女口述又粗又大感觉 | 麻生希在线观看 | bl放荡受np双性 | 国产高清小视频 | 精品国产乱码久久久久久软件 | 色偷偷亚洲综合网亚洲 | 车上小婕子系列辣文小说 | 精品久久久久久久国产潘金莲 | 日韩欧美国产免费看清风阁 | 美女全身体光羞羞漫画 | 欧美添下面视频免费观看 | 色多多视频在线 | 极品丝袜小说全集 | 羞羞一区二区三区四区片 | 青青草精品在线 | 欧美黑人性 | 猛男深夜狂cao小男生 | 亚洲日本在线观看网址 | 欧美调教打屁股spank视频 | www.男人| 69短视频 | 香蕉久久高清国产精品免费 | 国产成+人+综合+欧美 亚洲 | 免费一看一级毛片人 | 国产剧情麻豆刘玥视频 | 和两个男人玩3p好爽视频 | 欧美18-19| 91久久国产露脸精品 | pornohd老师18| caonila国产在线观看 | 亚洲AV 中文字幕 国产 欧美 | 男女男在线精品网站免费观看 | 1717国产精品视频免费 | 亚洲天堂免费看 | 国产日产欧产精品精品软件 | 国语视频高清在线观看 | 欧美大片一区 |