raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4561

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 高h文恩好大好爽| 经典三级四虎在线观看| 亚洲人的天堂男人爽爽爽| 成人资源影音先锋久久资源网| 欧美伦乱| 美女扒开腿让男人桶爽动态图片| 久久午夜一区二区| 天天乐影院| 肉文np高h| 沟厕okn系列在线播放| 扒开尿口| 美女张开腿让男人桶的 视频| 色版网站| xxxx在线视频| 国产91精品久久久久久久| 男人操男人| 色亚州| 美女尿口羞羞视频| 鬼吹灯天星术在线高清观看| 成人 在线欧美亚洲| 手机在线观看伦理片| 日韩免费在线观看| 午夜神器18以下不能进免费| v视界影院成片| 国产精品第| 欧美综合色网| 欧美va在线高清| 亚洲不卡视频| 外女思春台湾三级 | 双性产卵| 女女同性做爰xxoo亲吻| 1919gogo女厕盗摄| 日本老妇人乱视频| 男生和女生艹逼| 亚洲精品第二页| 亚洲精品91| mm在线| 精品日韩视频| www免费看| 精品亚洲视频在线观看| 波多野结衣中文丝袜字幕|