Steel curtain wall construction and process all-glass structures

Time:[2015-12-16]  Hits:5387

Steel curtain wall construction and process all-glass structures

 

Installation of Guangzhou Steel full glass curtain wall is a multi-joint construction trades, the process is complex and requires very sophisticated operation also needs to act in harmony troops. At the same time it is closely linked with the progress of the construction plans of other sub-project. In order to make the construction and installation of steel curtain wall smoothly, it is necessary according to the actual situation of the project, preparation of a good individual construction organization design, and confirmed by the Guangzhou Steel general contracting units.

The first is the project started preparatory work

Technical data collection

Site civil engineering design data collection and civil structure size measurements. Because there may be some fluctuation civil construction, the actual size is not always in line with the design drawings. Full glass curtain wall to the higher civil structures related to the size requirements. So before the design is necessary to measure the site to obtain first-hand information and data. And then to draw realistic view of a curtain separates the requirements of owners. About gated entrance of the site, there is a need and making active revolving door, the unit with full glass door, the glass curtain wall on the door and the door of a reliable shut. But also it needs to meet the requirements of the installation and repair of active revolving door.

Design and construction program concluded

Design and construction programs conclude. When the design of the glass curtain wall separated, in addition to consideration of uniform aesthetic appearance, we must also pay attention to minimize the glass of standard models. Since all types of building outdoor design are different, to have a large outdoor canopy, driving ramps and other projects, more attention should coordinate the overall construction sequence and progress, to avoid the construction and other outdoor facilities, the impact of walking and glass curtain wall crane installation. Before the formal construction, the construction scale should also be flattened infill site, good site clean-up, to ensure the smooth running crane.

Another is to prepare materials and machinery equipment

The main material quality check

(1) glass is not the right dimensions, with particular attention to check the glass in storage, whether the damage during transport, a crack is found, glass chipping must not be installed and should immediately tell the factory as soon as possible supplementary reworked.

(2) the raw material metal structural member is not in line with the design requirements, members are not straight, processing size, accuracy, hole orientation is not meet the design requirements. To a good first anti-rust paint brush, all member number must be labeled clearly.

Main construction equipment inspection

(1) Glass lifting and transportation machinery and equipment inspection, especially for crane operating systems and electric chucks performance checks.

(2) performance check various power and hand tools.

(3) azimuth orientation and design of embedded parts of deviation should not exceed 20mm.

Scaffolding

Due to the different needs of the construction program, the construction scaffolding structures must meet different requirements.

(1) discharge line and production load-bearing steel frame, should be set up at both sides of the wall surface of the glass, to facilitate workers in different directions, such as welding and installation work carried out.

(2) When installing the glass curtain wall, should be set up inside the walls of. To facilitate the lifting obliquely inserted into the glass does not touch the scaffolding, but also make standing up and down in various parts of the scaffold workers can easily hold the hand sucker can assist crane glass exact place.

(3) the glass in place after dispensing and cleaning phase, then the need to build a separate row in the outdoor scaffolding, due to the large all-glass curtain wall continuous area, the outdoor scaffolding was unable to pull connected with the main structure, so pay special attention to scaffolding support and stable, can land anchors, cables and pillars with braces then pull. Construction height of each operator should lay out scaffold boards, top to have fences, scaffold boards use wire fixation. In the construction and dismantling of scaffolding to be extra careful not to throw the steel and fasteners throw down from a height, to avoid damage to the glass.

Then that is an important project: steel curtain wall installation.

Steel curtain wall installation steps roughly as follows:

1. actinomycetes positioning;

2. The upper part of the load-bearing steel structure installation;

3. The lower portion of the side frame installation;

4. glass in place.

5. Note sealant;

6. Surface cleaning and inspection;

After that is completed the conservation and repair

At present, all-glass curtain wall maintenance and repair of the owners have not been enough attention. Now the whole glass curtain wall material used has a certain validity, but also regular observation and maintenance in normal use, so inspection after the hand over, and use of best conservation and development of curtain wall repair plan, and signed a contract with the company.

That is more than the flow of steel construction and all-glass curtain wall structure.
Guangzhou Steel Steel] find [Katsukuni specializes in steel plants, steel canopy, steel warehouses, steel garages, steel structure workshop, steel buildings, steel villa, steel buildings, steel carports, Steel manufacturers .18900873268 Leung Shenzhen steel companies, steel manufacturers, Foshan, Guangzhou steel company, Dongguan Stadium and other steel company Steel steel structure design and steel construction, but also to find Katsukuni, ISO certification quality more guaranteed.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 亚洲一成人毛片 | 免费370理论片中文字幕 | 国产情侣露脸自拍 | 四虎永久网址影院 | 国产成人在线播放视频 | 国产精品久久久久久久久齐齐 | 欧美日韩亚洲一区二区三区在线观看 | 好吊日在线 | 污斗罗大陆 | 猫咪色网| 情缘免费观看完整版 | 亚洲AV久久无码精品九号软件 | 性导航h| 我和老丈洗澡同性 | 四虎小视频 | 欧美 国产 日韩 第一页 | 国产欧美日韩精品一区二区三区 | 国产裸露片段精华合集链接 | 欧美男同互吃gay老头 | 金牛网155755水心论坛黄大父母 | 国产rpg迷雾之风冷狐破解 | 草莓视频深夜释放 | 亚洲四虎永久在线播放 | 深夜www| 亚洲国产高清一区二区三区 | xxx95日本老师xxx学生 | 色综合97天天综合网 | 亚洲欧美日韩在线观看看另类 | 四虎精品在线视频 | 国产日韩综合 | 九九精品视频一区二区三区 | 国产永久在线观看 | 亚洲精品国产成人中文 | 青草视频网 | 波多野结衣久久国产精品 | 欧美不卡一区二区三区免 | 亚洲免费小视频 | 午夜影院和视费x看 | 色图图片 | 欧美乱理伦另类视频 | 青青草精品 |