久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > Guangzhou Steel news: the Zhoukoudian cave ape started
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

Guangzhou Steel news: the Zhoukoudian cave ape started

Time:[2015-8-19]  Hits:5427

Guangzhou Steel news: the Zhoukoudian cave ape started "plus top"

 

Yesterday, the Zhoukoudian cave in the heart of the ape-man maintenance shed officially started construction. The maintenance shed in isolated rain, snow, hail, sun and other natural factors direct effect on the body at the same time the site will be possible to recover up to 20 million years ago, the original form.

The program of "minimum cover, to eliminate hidden dangers, with nature," the planning principles, to be built in the ape-man hole covers an area of ​​more than 3700 square meters of the maintenance shed. Maintenance shed span of 77.5 meters from north to south, east-west span of 54.5 meters and a maximum height of 35.7 meters, the use of space monolayer shells steel.

Site Management Office official said, the maintenance shed is the minimum required coverage area and height volume planning, site of the body in order to minimize interference, isolated rain, snow, hail, sunshine through the outer and inner layers of the roof build-planning, etc. the direct effect of natural factors on the ruins of the body, of the ape-man hole in the effective maintenance, while ensuring construction planning and site environment harmony. Guangzhou Steel

It is understood that the project is expected to end in late 2016. Pre-engineering will not cause too much impact on the visit, the site will divide the late opening hours.

According to reports, in order to make the Zhoukoudian site surrounding environment has been improved, the site perimeter has closed, shutting down the site surrounding nine cement plants, 11 shaft kiln production lines, 40 non-coal mines, 13 coal mines and other pollution and destruction of the natural environment industrial and mining enterprises, governance of the Zhoukoudian River and surrounding abandoned mines, planting more than 1,000 acres. Guangzhou Steel
■ Difficulties

1. Steel site construction is limited.

The construction site is located in the core area of ​​the ape-man cave, in the construction process does not destroy the ruins of the body, so the site layout is limited.

2. messy construction site environment.

Ape cave dense vegetation, narrow passageways, restricted construction conditions, lifting machinery is arranged with a certain degree of difficulty.

3. steel equipment and welding difficult.

Maintenance shed a single layer lattice shell structure, shape messy, slope, span, welding capacity, equipment and welding of steel structures request high.

The steel construction strict security measures.

As the construction site is located in the mountain below the maximum network shell drop of more than 30 meters, so the construction safety particularly high fall and fire will be among the control points of the project.

■ Introduction

Zhoukoudian cave ape's heart, and found about 40 representatives of "Peking Man," an individual close to 200 human fossils, more than one hundred thousand pieces of stone tools, several layers of ash and hundreds of kinds of animal fossils, is the most scientific value of the site iconic accumulation body, preserved ruins of the most complete stratigraphic sequence and the wealth of scientific information.

"200,000 years ago, there is a natural ceiling, but after the collapse when corrosion is now to be discovered." Site Management Office official said that since the twenties to explore, ape cave long suffered from sun, rain wind erosion and other natural forces of destruction, and therefore, from 2009 onwards, the joint to ape the West sectional hole excavations carried out maintenance work to clean up the disease according to the geological conditions and expert opinions, the cultural relics department and the Chinese Academy of Vertebrate Paleontology and Paleoanthropology, and start the Ape Man Cave collection maintenance plan, argument.

Tsinghua University Architecture Planning Institute Planning "Zhoukoudian first place (ape hole) Maintenance Plan Building Plan" was approved by the UNESCO World Heritage Centre and the National Heritage Board in 2013. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久青草国产在视频在线观看 | 欧美一级欧美三级在线 | 成人中文字幕在线观看 | 国产精品中文字幕 | 波多野结衣女教师在线观看 | 2021国产精品成人免费视频 | 精品久久成人免费第三区 | 国产精品99久久免费观看 | 石原莉奈被店长侵犯免费 | zol中关村在线官网 yy6080欧美三级理论 | 国产美女屁股直流白浆视频无遮挡 | 国产a在线 | 四虎成人免费视频 | 插入粉嫩 | 国产一精品一av一免费爽爽 | 国产成人综合视频 | 国产欧美日韩图片一区二区 | 国产小情侣自拍 | 丁香婷婷在线视频 | 日本三级做a全过程在线观看 | 久久久久激情免费观看 | 亚洲另类中文字幕 | 免费叼嘿视频 | 四虎影院在线 | 国产精品久久久精品日日 | 日韩高清一区二区 | 日本一区二区免费在线 | 精品破处 | a∨在线观看 | 高清视频在线播放 | 91tv在线观看 | 国产精品福利 | 啪啪大幂幂被c | 欧美a级在线观看 | 婷色| www91在线观看| 成在线人免费视频一区二区三区 | 免费看全黄特黄毛片 | www视频免费看 | 五月天91 | 60岁了天天要小伙子 |