久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5189

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 五月色综合婷婷综合俺来也| 亚洲午夜久久久久国产| 99热久久这里只有精品23| 视频在线观看一区二区| 大东北chinesexxxx露脸| 午夜精品久久久久久| 性猛交娇小69hd| 5555国产在线观看精品| 天美影视文化传媒mv免费| 亚洲第一区在线观看| cos美女被黄网站| 91高跟丝袜| 农村美女沟厕嘘嘘被偷看| 国产区成人综合色在线| 国产精品视频一区二区三区w| 亚洲、国产综合视频| 亚洲精品一区在线观看| 果冻传媒 天美 麻豆| 国产亚洲精品日韩香蕉网| 四虎在线网站| 亚洲精品成人a| 高清视频在线观看+免费| 俄罗斯处女摘花| 亚洲色图二区| 日日爱669| 男人的天堂在线观看免费| 福利视频一区青娱| 59日本人xxxxxxxxx69| 久久精品久久久久| 丝瓜秋葵番茄绿巨人在线观看| 色偷偷亚洲综合网亚洲| 国产另类视频一区二区三区| 91在线播| chinese东北痞子gay| 精品国产一区二区三区久久影院| 女子校生下媚药在线观看| 欧美人xxxxxbbbb| 色婷婷狠狠| 午夜电影三级还珠格格| 久久永久影院免费| 99久久精品6在线播放|