1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4594

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青青在线观看国产精品| 亚欧毛片基地国产毛片基地| 男男同志gaysxxx| 美女下面被cao出水| spy2wc48美女撒尿| 亚洲国产成人精品不卡青青草原| 成人性爱视频在线观看| 狠狠涩| 亚洲 欧美 国产 综合 在线| 色综合久久夜色精品国产| 久久婷婷电影网| 亚洲红怡院| 免费大片| 色综合色狠狠天天久久婷婷基地 | 4hc44四虎www在线影院男同| 欧美一区二区视频| 日韩在线视频二区| 国产精品久久久久久久久ktv| 99久久精彩视频| 手机看片福利盒子久久| 五花大绑esebdsm国产| 免费一区二区视频| 教师系列 大桥未久在线| xxy中国厕所| 波多野结衣在线中文| 哇嘎在线精品视频在线观看| 男女做受快插大片| 成人国产精品| 高清在线免费观看| chinese男同志videos| 亚洲国产高清一区二区三区| 欧美人妖大啪啪| 日韩精品一区二区三区毛片| 门房秦大爷小说| 高h肉厨房| 韩日视频在线观看| 99毛片| 国产小视频在线免费观看| 国产精品俺来也在线观看了| 久久永久影院免费| 国产资源免费观看|