1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4911

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲视频免 | 蝴蝶传媒免费安装 | 国产亚洲精品日韩香蕉网 | 国产精品99在线观看 | 国产一区二区三区在线观看视频 | 成人免费视频大全 | 日本高清免费不卡在线播放 | 91夜色视频 | 女攻双性| 丝瓜秋葵番茄绿巨人在线观看 | 日你逼 | 日韩精品特黄毛片免费看 | 91高清国产经典在线观看 | 农村老少伦小说 | 白丝校花掀起短裙呻吟小说 | 国产99在线a视频 | 成人观看免费大片在线观看 | 香蕉久久一区二区不卡无毒影院 | 午夜一个人在线观看完整版 | 日本妻子迷妹网 | 日本免费三片在线观看 | 2020国产精品视频免费 | 日韩一区二区三区四区五区 | 丝瓜污污 | 好大好深受不了了快进来 | 十大免费批日的软件 | 免费观看a毛片一区二区不卡 | 国产福利不卡视频 | 娇妻与公陈峰姚瑶小说在线阅读 | 草草草视频 | 国产成人愉拍免费视频 | 国产乱码一卡二卡3卡四卡 国产乱插 | 天天爽视频 | 第一次做m被调教经历 | 91四虎国自产在线播放线 | 国产成人v爽在线免播放观看 | 久青草国产97香蕉在线视频 | 色五婷婷 | 色天天色综合 | 国产农村一级特黄α真人毛片 | 亚洲 欧美 国产 综合久久 |