Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4333

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 二区三区在线观看| b站免费| 午夜dj免费视频观看社区| 精品视频网站| 国产一区二区三区四| 91香蕉小视频| 免费观看美女被cao视频| 四虎影院网址大全| 无遮挡h肉动漫高清在线| 法国女佣系列在线播放| fuqer日本| 国产福利视频一区二区微拍视频| 亚洲人尿尿| 色综合色综合| 欧美xxxbrazzers| 欧美日韩一区二区综合在线视频 | 91精品国产在线| 91制片厂制作传媒网站| 91久久偷偷做嫩草影院免费| 91热爆| 亚洲图片二区| 日本漫画工囗全彩内番e绅| 色综合久久九月婷婷色综合| 污翼鸟| 亚洲丰满女人ass硕大| 能播放的欧美同性videos| 思久久| 亚洲欧美国产在线| 视频一区国产精戏刘婷| 奇米影视4444| 欧美久久一区二区三区| 女人国产香蕉久久精品| 男女激情视频1000辣妞范| 国产九九| 黑人疯狂巨大xxoo| 金牛网155755水心论坛黄大父母| 国产亚洲视频在线| 好湿好紧好多水c| 精品亚洲视频在线| 九九精品视频一区二区三区| 狐媚小说|