Steel works construction schedule control content

Time:[2014-11-15]  Hits:5163

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 免费一区二区视频| 美女光屁股网站| 草莓绿巨人香蕉茄子芭乐| 亚洲成人网导航| 成人国产第一区在线观看| 四虎黄色影视库| 人人福利| 东北疯狂xxxxbbbb中国| 韩国一大片a毛片女同| 日韩成人免费| 日本一区二区高清免费不卡| 男人日女人的b| 国产一区在线看| 国产精品亚洲午夜不卡| 日本暖暖在线视频| 深夜福利免费观看| 国产精品麻豆久久99| 调教车文| 美女mm131爽爽爽久久| 特黄特色大片免费高清视频| 国产亚洲精品网站| 97色综合| 6个老师的尿奴| 四缺一写的小说| 女主被当众调教虐np| 高h肉厨房| 第一福利在线视频| 99在线资源| 天美蜜桃精东乌鸦传媒| 亚洲精品有码在线观看| 日本国产一区二区三区| 久久久96| www.东方影库| 国产精品短视频| 禁欲天堂| 精品精品国产yyy5857香蕉| 天天射寡妇射| 欧美a级在线观看| 熟睡中的麻麻大白屁股小说| 调教催眠| 国产网站免费看|