久久成人永久免费播放-久久成人亚洲香蕉草草-久久成人亚洲-久久成人免费播放网站-久久成人毛片-久久成人精品视频

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.moodyenergy.com.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5260

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费网址视频在线看 | 日本公与妇中文在线 | 女人叉开腿让男人捅 | 99国产热| 草草线在成年免费视频网站 | 国产91免费在线 | 国模大胆一区二区三区 | 欧美一级视频免费观看 | 日本色网址 | 高清麻生希在线 | 国产情侣自拍网 | 国产高清不卡码一区二区三区 | 国内精品哆啪啪 | 亚欧有色在线观看免费版高清 | 97福利社| 亚洲国产精品第一页 | 无码一区二区三区视频 | 免费一级欧美大片在线观看 | 国产偷窥女洗浴在线观看亚洲 | 日韩版码免费福利视频 | 国产精品久久毛片完整版 | 日本韩国一区二区三区 | 久久福利影院 | 成人亚洲欧美综合 | 无人区大片免费播放器 | 国产亚洲女人久久久久久 | 日本aa大片在线播放免费看 | 加勒比一本大道香蕉在线视频 | 无套白浆 | 亚洲精品一| 日本动漫啪啪动画片mv | 2021小妲己永久回家地址 | 久久99精品久久久久久园产越南 | 日韩在线观看免费 | 日本乱中文字幕系列在线观看 | 無码一区中文字幕少妇熟女H | 免费日本在线视频 | 欧美一级片观看 | 欧美日韩亚洲区久久综合 | 欧美日韩一区二区三区在线观看 | 日本在线不卡免 |