Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:1862

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精品va在线观看不 | 国产精品一区牛牛影视 | 波多野结衣家庭教师 | 国产一级免费片 | 男人在线网址 | 99爱爱| 高跟丝袜麻麻求我调教 | 好 舒服 好 粗 好硬 好爽 | 荡女淫春2古装 | 波多野结衣之双方调教在线观看 | 色天天综合色天天碰 | 国色天香 社区视频 | 午夜理论片日本中文在线 | 亚洲精品久久久WWW游戏好玩 | 黄 色 大 片 网站 | 热门小说同人h改编h | 亚洲一区二区三区深夜天堂 | 99r视频 | 国产精品毛片久久久久久久 | 4tube欧美高清 | 国产亚洲精品日韩香蕉网 | 不卡一区二区三区卡 | 国内精品国语自产拍在线观看55 | 欧美日韩免费一区二区在线观看 | 999热在线精品观看全部 | 国产高清一区二区三区免费视频 | 为什么丈夫插我我却喜欢被打着插 | 亚洲成人77777 | 成人看片免费无限观看视频 | 非洲黑人xxxxxbbbbb | 成人女人天堂午夜视频 | 国产精品久久久久久福利 | 1717she精品视频在线观看 | 亚洲精品国产A久久久久久 亚洲精品福利一区二区在线观看 | 苍井空色欲迷墙 | 女人肮脏的交易中文字幕未删减版 | 特色特色大片在线 | 五月色婷婷久久综合 | 男人叼女人的痛爽视频免费 | 欧美三级不卡视频 | 娇妻与公陈峰姚瑶小说在线阅读 |