Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:1908

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 黄色大片网站| 无码人妻99久久密AV| 91桃色视频在线观看| 窝窝午夜精品一区二区| 寡妇一级毛片| 欧美三级做爰全过程| 久久综合网久久综合| 我与么公激情性完整视频| 女子监狱第二季未删减在线看| 国产欧美日韩不卡一区二区三区| 午夜看片a福利在线观看| 四缺一的小说| 精品国产线拍大陆久久尤物| 国产欧美一区二区成人影院| 深夜在线小视频| 亚洲一区二区日韩欧美gif| 国产成人精品高清在线| 国产传媒天美果冻| 午夜想想爱午夜剧场| 亚洲精品国产综合久久一线 | 国产精品99爱免费视频| 双性肉文高h| 美女天天操| 荷兰精品女人性hd| 成人性生交小说免费看| 久久综久久美利坚合众国| 日本xxxxxl1820| 欧美在线观看一区二区三| 亚洲天堂99| 午夜伦伦电影理论片大片| 国产精品久久久久久久久99热| 国产三级精品91三级在专区| 女黑人尺寸bbb| 美女模特被c免费视频| 日本综合在线观看| 国产精品第1页在线播放| gaychinese男男2022| 美女和男生搞基| 欧美日韩国产亚洲一区二区| 香港论理午夜电影网| 欧美美女被爆操|