Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2173

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 纲手被漫画aⅴ| 好大好想要| 美女尿口羞羞视频| a亚洲天堂| 手机看片自拍| 潘金莲西门庆一级淫片aaaaaa | 亚洲精品久久7777777| 免费观看国产大片资源视频| ts人妖另类国产| 免费视频 久久久| 欧美男同videos| zoomkool最新版| 国产精亚洲视频| 天天噜| 亚洲精品在线免费| 男人天堂官方网站| 69热精品视频在线看影院| 久久国产乱子伦精品免费不卡| 日韩在线免费| 欧美一级特黄特色大片免费| 午夜秀场在线观看| 久久婷婷丁香五月色综合啪免费| www.四虎.com| 蜜桃视频在线观看官网| 亚洲色图综合网| 国内精品伊人久久大香线焦| 国语自产拍在线观看7m| 夫承子液by免费阅读| 亚洲图片 自拍偷拍| 日本伊人久久| 清清草在线视频| 成人欧美1314www色视频| 精品综合久久久久久8888| 999久久精品国产| 欧美高清一区| 天天射寡妇射| 啪啪导航| 美女被爆| 小寡妇好紧进去了好大看视频| 日韩专区| 毛片免|